The
existing driveway was
cut out to form footings for the new exterior walls.
Plumbing was added
for sink relocation.
The 8'' solid brick exterior walls will be removed and reused to match
original exactly. This will double the size of the existing kitchen!
|
See more of this project:
|
See the new kitchen |
|
During
the construction |
|
More
preparation |
|
Check
out the brickwork |
|
Check
out finished outside |
|
|